Aviation Projects
Over the last two decades, Prosource has been at the forefront in developing modern mechanical and electrical control systems for both major and minor commercial airports within Australia and internationally. Australian projects include:- Alice Springs Airport: 1993
- Archerfield Airport: current
- Australian Army: 2000
- Broome International: current
- Cairns Airport JUHI: 2004 - current
- Cairns General Aviation: 2007-2008
- Christmas Island Airport: 1995
- Darwin Airport: 2004
- Horn Island Airport: 1997
- Jandakot Airport: 1997
- Mackay Airport: 1997
- Moomba Airport: current
- Perth Airport JUHI: 1997 ongoing
- Port Hedland Airport: 2004
- Royal Australian Airforce: 2000
- West Angeles & Brockman Airports: 2005
International projects include:
- Bauerfield Airport, Vanuatu: 2005-2006
- Changi Airport, Singapore, Cargo Bays Hydrant Extension: 2004-2006
- Changi Airport, Singapore, Fuel Storage Terminal - CAFHI: 2004-2007
- Changi Airport, Singapore, Runway 3: 2005
- Kuching Airport, East Malaysia: 2006-2007
- Manila Airport, Philippines JOCASP: 2005
- Nasouri Airport, Fiji: 2006
- Santo Fuel Storage Terminal, Vanuatu: 2005
- Seletar Airport, Singapore: 2000
The above projects included:
- Tank farm automation
- Bulk storage reception, storage and outloading
- Tank gauging systems for above and underground storage tanks
- Bulk storage tank design and associated appurtenances from 1 to 10 million litres
- Horizontal storage tank design and associated appurtenances from 5000 to 110,000 litres
- Portable systems (rapid deployment packages) - pump and storage tank skids
- Auto tank level management systems for above ground storage tanks - Automated Overfill Protection
- Hydrant - pipelines, pump, pipe, filtration and automated control systems
- Transmission and wharf pipelines
- Remote control monitoring and PLC based control systems
- Ability provided to upgrade control systems via "dial in" modem
- Emergency power supply for many of the above systems